LLC Delta Mshenebeli
Rehabilitation of ventilation system at Kapandibi Military Base. Budget: 289 000 GEL

Rehabilitation of ventilation system at Kapandibi Military Base. Budget: 289 000 GEL
Installation of 5,000 kW boilers. Budget: 398 000 GEL
Installation of heating pipelines at Paldo Military Training Base. Budget: 398 000 GEL
Engineering and installation of heating, cold and hot water supply, ventilation, air conditioning, sewage, wastewater, and fire safety systems in 3 residential buildings near Mziuri, Tbilisi. Budget: 5 954 000 GEL
Rehabilitation of a 5 MW boiler at Gori Military Academy. Budget: 387 765 GEL
Rehabilitation of a 10 MW boiler and heating and hot water systems at Senaki Military Base. Budget: 887 540 GEL
Installation of heating, ventilation, plumbing, and fire suppression systems at hotel on Goderdzi Pass. Budget: 267 198 GEL
Design of heating, water supply, sewage, fire suppression, and low voltage electrical systems at 49 Krtsanisi Street, Tbilisi. Budget: 46 692 GEL
Design of heating, water supply, sewage, fire suppression, and low voltage electrical systems in Kobuleti. Budget: 84 477 GEL
Design of heating, water supply, sewage, fire suppression, and low voltage electrical systems at Green Café site, Batumi. Budget: 90 414 GEL
Design works for heating, water supply, sewage, fire suppression, and low voltage electrical systems in TWIN and F blocks of the apartotel in Kaishauri, New Gudauri. Budget: 246 752 GEL
Design and installation of heating, hot and cold water, sewage, and ventilation systems in a residential block in Gudauri. Budget: 510 035 GEL
Engineering and installation works of heating, water supply, sewage, fire suppression, and low voltage electrical systems in Neo block of apartotel in New Gudauri (Kaishauri). Budget: 3 641 840 GEL
Installation of heating, cooling, ventilation, water supply, and sewage systems. Budget: 522 985 GEL
Installation of heating, cooling, ventilation, water supply, sewage, and fire safety systems in Marriott Apartotel, Batumi. Budget: 1 395 807 GEL
Installation of heating, cooling, and ventilation systems. Budget: 66 779 GEL
Installation of heating, cooling, and ventilation systems. Budget: 75 627 GEL
Rehabilitation of heating, cooling, ventilation, and hot water systems at military bases (Senaki, Khoni, Kutaisi, Kojori, Vaziani, etc.). Budget: 4 249 725 GEL
Installation of heating, cooling, and ventilation systems. Budget: 98 613 GEL
Installation of heating, cooling, and ventilation systems. Budget: 98 321 GEL
Installation of heating, cooling, and ventilation systems. Budget: 80 044 GEL
Installation of heating, cooling, and ventilation systems. Budget: 58 790 GEL
Water supply and installation of automated pumping station. Budget: 74 364 GEL
Installation of heating, cooling, and ventilation systems. Budget: 90 995 GEL
Installation of heating, cooling, and ventilation systems. Budget: 798 650 GEL
Boiler room rehabilitation. Budget: 69 875 GEL
Installation of heating, cooling, and ventilation systems. Budget: 61 580 GEL
Installation of automated water supply pumping station. Budget: 91 830 GEL
Installation of boiler room, heating, and cooling systems. Budget: 225 349 GEL
Installation of heating, cooling, and ventilation systems. Budget: 97 000 GEL
Design and installation of heating, cooling, and ventilation systems. Budget: 105 470 GEL
Installation of heating, cooling, ventilation, hot water, and humidity control systems in a classified underground shelter. Budget: 1 892 552 GEL
Installation of heating, plumbing, and ventilation systems. Budget: 952 190 GEL
Design and installation of heating, plumbing, and ventilation systems. Budget: 83 487 GEL
Rehabilitation of heating, cooling, and ventilation systems in the Ministry’s central building. Budget: 287 000 GEL
Installation works of pumping station and main pipelines. Budget: 338 460 GEL
Installation of heating, air conditioning, and ventilation systems. Budget: 82 490 GEL
Installation of boiler room, heating, and water supply pipelines. Budget: 6 387 420 GEL
Installation of heating, cold and hot water supply, and plumbing systems. Budget: 1 597 640 GEL
Installation of heating, air conditioning, and ventilation systems. Budget: 102 480 GEL
Installation of temperature and humidity control systems. Budget: 2 397 000 GEL
Design and installation of heating, cooling, and ventilation systems in the mall and office building. Budget: 287 850 GEL
Installation of heating, air conditioning, and ventilation systems. Budget: 257 600 GEL
Installation of heating, air conditioning, and ventilation systems. Budget: 253 487 GEL
Supply and installation of heating, air conditioning, and ventilation systems. Budget: 269 390 GEL
Installation of heating, air conditioning, and ventilation systems. Budget: 193 540 GEL
Installation of temperature and humidity control systems. Budget: 3 398 620 GEL
Installation of heating and cooling systems. Budget: 689 570 GEL
Installation of heating and cooling systems. Budget: 145 300 GEL
Installation of heating and cooling systems. Budget: 78 650 GEL
Installation of boiler room, cold and hot water pipeline systems. Budget: 98 640 GEL