Terix projects

PROJECTS

2025

LLC Delta Mshenebeli

Rehabilitation of ventilation system at Kapandibi Military Base. Budget: 289 000 GEL

2024-2025

Gori Military Academy

Installation of 5,000 kW boilers. Budget: 398 000 GEL

2023-2024

LLC Delta Mshenebeli

Installation of heating pipelines at Paldo Military Training Base. Budget: 398 000 GEL

2023

LLC Anagi Development 1

Engineering and installation of heating, cold and hot water supply, ventilation, air conditioning, sewage, wastewater, and fire safety systems in 3 residential buildings near Mziuri, Tbilisi. Budget: 5 954 000 GEL

2022

Ministry of Defense of Georgia

Rehabilitation of a 5 MW boiler at Gori Military Academy. Budget: 387 765 GEL

2021-2022

Ministry of Defense of Georgia

Rehabilitation of a 10 MW boiler and heating and hot water systems at Senaki Military Base. Budget: 887 540 GEL

2020

Alliance Villa Development

Installation of heating, ventilation, plumbing, and fire suppression systems at hotel on Goderdzi Pass. Budget: 267 198 GEL

2020

RedCo – Krtsanisi

Design of heating, water supply, sewage, fire suppression, and low voltage electrical systems at 49 Krtsanisi Street, Tbilisi. Budget: 46 692 GEL

2020

RedCo Tskhisdziri

Design of heating, water supply, sewage, fire suppression, and low voltage electrical systems in Kobuleti. Budget: 84 477 GEL

2020

LLC Mtsvane Kontskhi-Botaniko

Design of heating, water supply, sewage, fire suppression, and low voltage electrical systems at Green Café site, Batumi. Budget: 90 414 GEL

2020

LLC RedCo (Gudauri Apartotel)

Design works for heating, water supply, sewage, fire suppression, and low voltage electrical systems in TWIN and F blocks of the apartotel in Kaishauri, New Gudauri. Budget: 246 752 GEL

2020

LLC “Roshka”

Design and installation of heating, hot and cold water, sewage, and ventilation systems in a residential block in Gudauri. Budget: 510 035 GEL

2019-2020

LLC “Anagi”

Engineering and installation works of heating, water supply, sewage, fire suppression, and low voltage electrical systems in Neo block of apartotel in New Gudauri (Kaishauri). Budget: 3 641 840 GEL

2018

LLC “AA4”

Installation of heating, cooling, ventilation, water supply, and sewage systems. Budget: 522 985 GEL

2017

LLC “Alliance”

Installation of heating, cooling, ventilation, water supply, sewage, and fire safety systems in Marriott Apartotel, Batumi. Budget: 1 395 807 GEL

2016

LLC “Aversi-Pharma”

Installation of heating, cooling, and ventilation systems. Budget: 66 779 GEL

2016-2018

Ministry of Internal Affairs of Georgia

Installation of heating, cooling, and ventilation systems. Budget: 75 627 GEL

2015-2017

Ministry of Defense of Georgia

Rehabilitation of heating, cooling, ventilation, and hot water systems at military bases (Senaki, Khoni, Kutaisi, Kojori, Vaziani, etc.). Budget: 4 249 725 GEL

2014

LLC “Matrix”

Installation of heating, cooling, and ventilation systems. Budget: 98 613 GEL

2013

LLC “Omega 2”

Installation of heating, cooling, and ventilation systems. Budget: 98 321 GEL

2013

LLC “Farming House”

Installation of heating, cooling, and ventilation systems. Budget: 80 044 GEL

2013

JSC “Geocell”

Installation of heating, cooling, and ventilation systems. Budget: 58 790 GEL

2013

Sartichala

Water supply and installation of automated pumping station. Budget: 74 364 GEL

2012

LLC “Construction Company – Builder 2011”

Installation of heating, cooling, and ventilation systems. Budget: 90 995 GEL

2012

Ministry of Defense of Georgia

Installation of heating, cooling, and ventilation systems. Budget: 798 650 GEL

2012-2013

Gori 5th Infantry Brigade

Boiler room rehabilitation. Budget: 69 875 GEL

2012

LLC “Alta”

Installation of heating, cooling, and ventilation systems. Budget: 61 580 GEL

2012

Gori National Defense Academy

Installation of automated water supply pumping station. Budget: 91 830 GEL

2012

Gori National Defense Academy

Installation of boiler room, heating, and cooling systems. Budget: 225 349 GEL

2011

Ministry of Culture of Georgia

Installation of heating, cooling, and ventilation systems. Budget: 97 000 GEL

2011

Sarpi Customs

Design and installation of heating, cooling, and ventilation systems. Budget: 105 470 GEL

2010-2011

Ministry of Defense of Georgia

Installation of heating, cooling, ventilation, hot water, and humidity control systems in a classified underground shelter. Budget: 1 892 552 GEL

2010

Cadet Lyceum of Kutaisi

Installation of heating, plumbing, and ventilation systems. Budget: 952 190 GEL

2010

Senaki Theological School

Design and installation of heating, plumbing, and ventilation systems. Budget: 83 487 GEL

2009

Ministry of Defense of Georgia

Rehabilitation of heating, cooling, and ventilation systems in the Ministry’s central building. Budget: 287 000 GEL

2009-2010

Senaki Military Base 1

Installation works of pumping station and main pipelines. Budget: 338 460 GEL

2009

Ministry of Justice of Georgia

Installation of heating, air conditioning, and ventilation systems. Budget: 82 490 GEL

2008-2009

Senaki Military Base

Installation of boiler room, heating, and water supply pipelines. Budget: 6 387 420 GEL

2008-2009

Residential Complex “Park Place” – Bagebi City Group

Installation of heating, cold and hot water supply, and plumbing systems. Budget: 1 597 640 GEL

2008

LLC “MK”

Installation of heating, air conditioning, and ventilation systems. Budget: 102 480 GEL

2007-2008

Ministry of Defense Underground Warehouses

Installation of temperature and humidity control systems. Budget: 2 397 000 GEL

2006-2007

Shopping Center “Megaline”

Design and installation of heating, cooling, and ventilation systems in the mall and office building. Budget: 287 850 GEL

2005-2007

LLC “Architects and Company”

Installation of heating, air conditioning, and ventilation systems. Budget: 257 600 GEL

2005

LLC “Magtivin”

Installation of heating, air conditioning, and ventilation systems. Budget: 253 487 GEL

2004

JSC Bank of Georgia

Supply and installation of heating, air conditioning, and ventilation systems. Budget: 269 390 GEL

2004

World Bank Representation in Georgia

Installation of heating, air conditioning, and ventilation systems. Budget: 193 540 GEL

2002-2007

Central and Peripheral Stations of “MagtiCom” HQ

Installation of temperature and humidity control systems. Budget: 3 398 620 GEL

2001-2005

“MagtiCom” Headquarters

Installation of heating and cooling systems. Budget: 689 570 GEL

1999

AES Telasi Gardabani Office

Installation of heating and cooling systems. Budget: 145 300 GEL

1999

“MagtiCom” Headquarters

Installation of heating and cooling systems. Budget: 78 650 GEL

1998

Hotel in Bakuriani

Installation of boiler room, cold and hot water pipeline systems. Budget: 98 640 GEL