2025
LLC Delta Mshenebeli
Rehabilitation of ventilation system at Kapandibi Military Base. 289 000 GEL
LLC Delta Mshenebeli
Installation of heating pipelines at Paldo Military Training Base. 398 000 GEL
2023
LLC Anagi Development 1
Engineering and installation of heating, cold and hot water supply, ventilation, air conditioning, sewage, wastewater, and fire safety systems in 3 residential buildings near Mziuri, Tbilisi. 5 954 000 GEL
2022
Ministry of Defense of Georgia
Rehabilitation of a 5 MW boiler at Gori Military Academy. 387 765 GEL
2021-2022
Ministry of Defense of Georgia
Rehabilitation of a 10 MW boiler and heating and hot water systems at Senaki Military Base. 887 540 GEL
Alliance Villa Development
Installation of heating, ventilation, plumbing, and fire suppression systems at hotel on Goderdzi Pass. 267 198 GEL
2020
RedCo Tskhisdziri
Design of heating, water supply, sewage, fire suppression, and low voltage electrical systems in Kobuleti. 84 477 GEL
2020
LLC Mtsvane Kontskhi-Botaniko
DDesign of heating, water supply, sewage, fire suppression, and low voltage electrical systems at Green Café site, Batumi. 90 414 GEL
2020
LLC RedCo (Gudauri Apartotel)
Design works for heating, water supply, sewage, fire suppression, and low voltage electrical systems in TWIN and F blocks of the apartotel in Kaishauri, New Gudauri. 246 752 GEL
2019-2020
LLC “Anagi”
Engineering and installation works of heating, water supply, sewage, fire suppression, and low voltage electrical systems in Neo block of apartotel in New Gudauri (Kaishauri). 3 641 840 GEL
2020
LLC “Roshka”
Design and installation of heating, hot and cold water, sewage, and ventilation systems in a residential block in Gudauri. 510 035 GEL
2018
LLC “AA4”
Installation of heating, cooling, ventilation, water supply, and sewage systems. 522,985 GEL
2017
LLC “Alliance”
Installation of heating, cooling, ventilation, water supply, sewage, and fire safety systems in Marriott Apartotel, Batumi. 1 395 807 GEL
2015-2017
Ministry of Defense of Georgia
Rehabilitation of heating, cooling, ventilation, and hot water systems at military bases (Senaki, Khoni, Kutaisi, Kojori, Vaziani, etc.). 4 249 725 GEL
2016
LLC “Aversi-Pharma”
Installation of heating, cooling, and ventilation systems. 66 779 GEL
2016-2018
Ministry of Internal Affairs of Georgia
Installation of heating, cooling, and ventilation systems. 75 627 GEL
2013
LLC “Omega 2”
Installation of heating, cooling, and ventilation systems. 98 321 GEL
2013
LLC “Farming House”
Installation of heating, cooling, and ventilation systems. 80 044 GEL
2013
JSC “Geocell”
Installation of heating, cooling, and ventilation systems. 58 790 GEL
2013
Sartichala
Water supply and installation of automated pumping station. 74 364 GEL
2012-2013
Gori 5th Infantry Brigade
Boiler room rehabilitation. 69 875 GEL
2012
LLC “Construction Company – Builder 2011”
Installation of heating, cooling, and ventilation systems. 90 995 GEL
2012
Ministry of Defense of Georgia
Installation of heating, cooling, and ventilation systems. 798 650 GEL
2012
LLC “Alta”
Installation of heating, cooling, and ventilation systems. 61 580 GEL
2012
Gori National Defense Academy
Installation of automated water supply pumping station. 91 830 GEL
2012
Gori National Defense Academy
Installation of boiler room, heating, and cooling systems. 225 349 GEL
2011
Ministry of Culture of Georgia
Installation of heating, cooling, and ventilation systems. 97 000 GEL
2011
Sarpi Customs
Design and installation of heating, cooling, and ventilation systems. 105 470 GEL
Ministry of Defense of Georgia
Installation of heating, cooling, ventilation, hot water, and humidity control systems in a classified underground shelter. 1 892 552 GEL
2010
Cadet Lyceum of Kutaisi
Installation of heating, plumbing, and ventilation systems. 952 190 GEL
2010
Senaki Theological School
Design and installation of heating, plumbing, and ventilation systems. 83 487 GEL
2009
Ministry of Defense of Georgia
Rehabilitation of heating, cooling, and ventilation systems in the Ministry’s central building. 287 000 GEL
2009-2010
Senaki Military Base 1
Installation works of pumping station and main pipelines. 338 460 GEL
2008-2009
Senaki Military Base
Installation of boiler room, heating, and water supply pipelines. 6 387 420 GEL
2008-2009
Residential Complex “Park Place” – Bagebi City Group
Installation of heating, cold and hot water supply, and plumbing systems. 1 597 640 GEL
2009
Ministry of Justice of Georgia
Installation of heating, air conditioning, and ventilation systems. 82 490 GEL
2008
LLC “MK”
Installation of heating, air conditioning, and ventilation systems. 102 480 GEL
2007-2008
Ministry of Defense Underground Warehouses
Installation of temperature and humidity control systems. 2 397 000 GEL
Shopping Center “Megaline”
Design and installation of heating, cooling, and ventilation systems in the mall and office building. 287 850 GEL
2005-2007
LLC “Architects and Company”
Installation of heating, air conditioning, and ventilation systems. 257 600 GEL
2005
LLC “Magtivin”
Installation of heating, air conditioning, and ventilation systems. 253 487 GEL
2004
JSC Bank of Georgia
Supply and installation of heating, air conditioning, and ventilation systems. 269 390 GEL
2004
World Bank Representation in Georgia
Installation of heating, air conditioning, and ventilation systems. 193 540 GEL
2002-2007
Central and Peripheral Stations of “MagtiCom” HQ
Installation of temperature and humidity control systems. 3 398 620 GEL
2001-2005
“MagtiCom” Headquarters
Installation of heating and cooling systems. 689 570 GEL
1999
AES Telasi Gardabani Office
Installation of heating and cooling systems. 145 300 GEL
1999
“MagtiCom” Headquarters
Installation of heating and cooling systems. 78 650 GEL
1998
Hotel in Bakuriani
Installation of boiler room, cold and hot water pipeline systems. 98 640 GEL